As soon as PDU circuit breakers are switched on, standby power is applied, and the SP
Note -
boots.
See
"Switch on PDU Circuit Breakers" on page 73
9.
Restart the server.
-> start /System
10.
Return the replaced component to Oracle.
See
"Prepare a Component for Return to Oracle" on page
Related Information
"Remove a PDU" on page 256
■
"Switch on PDU Circuit Breakers" on page 73
■
for the order to switch the breakers.
64.
Servicing PDUs
Install a PDU
267