Prepare A Switch Unit For Removal - Oracle SPARC M8 Service Manual

Hide thumbs Also See for SPARC M8:
Table of Contents

Advertisement

No.
LED
4
ECB fault (amber)
Related Information
"Checking for Faults" on page 35
"Interpreting LEDs" on page 44

Prepare a Switch Unit for Removal

Replace a switch unit when the replacement switch unit is available.
Complete the following steps before you remove a switch unit.
The switch unit replacement kit includes plastic covers to protect switch unit connectors.
Note -
Return these covers to Oracle.
Determine which switch unit requires service.
1.
See
"Identify Faulted Components" on page 36
2.
If you are replacing a switch unit, unpack the new switch unit on a grounded
antistatic mat.
See
"Prevent ESD Damage" on page
3.
Verify that the switch unit has been removed from service.
-> show /System/Other_Removable_Devices/Scalability_Switch_Boards
/Scalability_Switch_Board_x health
Properties:
health = Offline
Determine your next step.
If health returns a value of Service Required, go to
If health returns a value of Offline, go to
Only if required, stop the server.
4.
Icon
Description
Indicates that a PDECB requires service.
61.
Prepare a Switch Unit for Removal
and
"Switch Unit LEDs" on page
Step
4.
Step
5.
Servicing Switch Units
190.
191

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sparc m7

Table of Contents