Oracle SPARC M8 Service Manual page 284

Hide thumbs Also See for SPARC M8:
Table of Contents

Advertisement

Install a Switch Chassis
8.
From the rear of the server, install the top hold-down brackets.
9.
Switch on the appropriate PDU circuit breakers and power on the server.
"Returning the Server to Operation" on page
10.
Verify that the fault has been cleared and the replaced component is operational.
See
"Verify That a Fault Has Been Cleared" on page
Related Information
"Remove a Switch Chassis" on page 277
"Servicing the CMIOU Chassis" on page 269
284
SPARC M8 and SPARC M7 Servers Service Manual • September 2017
73.
54.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sparc m7

Table of Contents