Deployment CPU 013-CCF0R00
Hardware configuration - Ethernet PG/OP channel
4.7 Hardware configuration - Ethernet PG/OP channel
Overview
Assembly and commis-
sioning
72
Please note!
–
At the first commissioning respectively after a reset to factory setting
the Ethernet interface has no IP address.
–
For online access, you have to assign valid IP address data to it by
means of "Initialization".
–
After initialization, you can transfer the IP address data to your
project.
The CPU has an integrated Ethernet PG/OP channel. This channel allows you to pro-
gram and remote control your CPU.
n
The Ethernet PG/OP channel (X1/X2) is designed as switch. This enables PG/OP
communication via the connections X1 and X2.
n
Configurable connections are possible.
n
DHCP respectively the assignment of the network configuration with a DHCP server
is supported.
n
Default diagnostics addresses: 2025 ... 2040
Via the Ethernet PG/OP channel, you have access to:
n
–
Device website, where you can find information on firmware status, connected
peripherals, current cycle times, etc.
–
OPC UA project, which is to be created in the OPC UA Configurator.
–
WebVisu project, which is to be created in the SPEED7 Studio.
–
PROFINET IO controller or the PROFINET I-Device.
1.
Install your System SLIO with your CPU.
2.
Wire the system by connecting cables for voltage supply and signals.
3.
Connect the one of the Ethernet jacks (X1, X2) of the Ethernet PG/OP channel to
Ethernet.
4.
Switch on the power supply.
ð After a short boot time the CP is ready for communication. He possibly has no
IP address data and requires an initialization.
VIPA System SLIO
HB300 | CPU | 013-CCF0R00 | en | 19-30