At the first commissioning respectively after an overall reset with PowerON again of the
CPU, the Ethernet PG/OP channel has no IP address. This can only be reached by its
MAC address. By means of the MAC address, which is printed at the front as 'MAC PG/
OP:...' , you can assign IP address data. The assignment takes place directly via the
hardware configuration of the Siemens SIMATIC Manager.
For the configuration of the Ethernet PG/OP channel for productive connections please
follow the following approach:
n
Hardware configuration - CPU
n
Hardware configuration - Ethernet PG/OP channel
n
Configure connections
–
Siemens S7 connections
(Configuration via Siemens NetPro, communication via VIPA handling blocks)
–
Open communication
(Configuration and communication happens by standard handling blocks)
n
Transfer of the complete project to CPU
At the first commissioning respectively after an overall reset with PowerON again of the
CPU, the Ethernet PG/OP channel has no IP address. This can only be reached by its
MAC address. By means of the MAC address, which is printed at the front as 'MAC PG/
OP:...' , you can assign IP address data. The assignment takes place directly via the
hardware configuration of the Siemens SIMATIC Manager.
n
CPU
Ä Chap. 4.5 'Hardware configuration - CPU' page 69
n
Ethernet PG/OP channel
Ä Chap. 4.7 'Hardware configuration - Ethernet PG/OP channel' page 72
The project engineering of connections i.e. the "link-up" between stations happens in
NetPro from Siemens. NetPro is a graphical user interface for the link-up of stations. A
communication connection enables the program controlled communication between two
participants at the Industrial Ethernet. The communication partners may here be part of
the same project or - at multi projects - separated within related part projects. Communi-
cation connections to partners outside of a project are configured via the object "In
unknown project" or via deputy objects like "Other stations" or Siemens "SIMATIC S5 Sta-
tion". The communication is controlled by the user program with VIPA handling blocks. To
use this blocks, configured communication connections are always necessary in the
active station.
Ä 'Link-up stations' page 223
Ä 'Projecting connections' page 224
Ä 'Siemens S7 connection - Communication functions' page 226
The following properties are characterizing a communication connection:
n
One station always executes an active connection establishment.
n
Bi-directional data transfer (Send and receive on one connection)
Deployment PG/OP communication - productive
Configure Siemens S7 connections