Xerox WorkCentre 7132 Service Documentation page 57

Service manual
Hide thumbs Also See for WorkCentre 7132:
Table of Contents

Advertisement

003-344 Hotline Power On
BSD-ON:3.1/6.2
There is a communication failure at power on between the controller and the IIT.
Initial Actions
Power On/Off
Procedure
Disconnect and reconnect the IIT/IPS PWB Harness.
If the problem persists replace the IIT/IPS PWB (PL 13.3).
If the problem persists replace the ESS PWB (PL 11.2).
Status-indicator-raps
003-344, 003-345
003-345 PIO Unlatched 1 RAP
BSD-ON:3.1/6.2
When Job Fail signal was received from the IIT/IPS PWB, a hot line PIO (Programmed Input
Output) error was detected.
Procedure
Disconnect and reconnect the IIT/IPS PWB Harness.
If the problem persists replace the IIT/IPS PWB (PL 13.3).
If the problem persists replace the ESS PWB (PL 11.2).
January 2007
2-34
Revision
WorkCentre 7132

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents