lower than with the protection core. This should be taken into account
when setting the current circuit supervision function.
IL1
IL2
IL3
GUID-C5A6BB27-36F9-4652-A5E4-E3D32CFEA77B-ANSI V3 EN
Figure 439:
Connection diagram for current circuit supervision with two sets of three-
phase current transformer cores (protection and measurement)
Example of incorrect connection
The currents must be measured with two independent cores, that is, the phase currents
must be measured with a different core than the reference current. A connection diagram
shows an example of a case where the phase currents and the reference currents are
measured from the same core.
Supervision functions
protection relay
CCM
FAIL
I_A
I_A
I_B
I_B
ALARM
I_C
I_C
I_REF
I_REF
BLOCK
Measurement device