Install a Power Supply
Installing a power supply is a hot-swap operation. You do not need to power off the server
before installing the power supply.
1.
Consider your first step.
If you are replacing a power supply, remove the faulty or obsolete power supply first, then
■
return to this procedure,
If you are installing a power supply as part of another component's removal or installation
■
procedure, go to
2.
Align the power supply to the location where it installs into the chassis.
The PDB connector is toward the chassis, and the release tab is on the left.
Slide the power supply into the chassis until the power supply seats and the
3.
release tab clicks.
4.
Attach the power cord.
Step
2. See
"Remove a Power Supply" on page
Step
2.
Install a Power Supply
122.
Servicing Power Supplies
125
Need help?
Do you have a question about the netra X5-2 and is the answer not in the manual?
Questions and answers