25. Install the transaxle upper retaining studs.
26. Attach the power steering pressure pipe bracket
to the transaxle.
27. Install the cooling fluid tube bracket retaining
nuts.
Attach the central electrical connector
bracket to the transaxle.
28. Install the positive crankcase ventilation (PCV)
unit upper retaining nut.
Attach the PCV unit to the transaxle.
29. Tighten the strut and spring assembly top mount
retaining nuts on both sides.
30. Connect the reversing lamp switch electrical
connector.
http://vnx.su