SSANGYONG 1999 Musso Service Manual page 755

Table of Contents

Advertisement

1F3-26 OM600 ENGINE CONTROLS
Tools Required
001 589 65 09 00 Serration Wrench
Removal & Installation Procedure
1. Remove the plastic clip from the injection pipe
2. Remove the fuel return hose.
3. Disconnect the injection pipes from the injection nozzles and
push them to the side.
4. Remove the fuel injection nozzle.
Notice
Replace the washers.
5. Installation should follow the removal procedure in the
reverse order.
Notice
Pay attention to the installation position of new nozzle washer
and tightening torque
Serration Wrench 001 589 65 09 00

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents