SSANGYONG 1999 Musso Service Manual page 1126

Table of Contents

Advertisement

13. Using a 21 mm wrench or a T-50 bit, remove the 5-R lever
pivot bolt.
Notice
Apply sealer bond to this bolt during assembly.
14. Using a 22 mm wrench, remove the back-up lamp switch
from the 5-R lever side.
Notice
Apply sealer to the threads.
15. Pull out the 5-R lever out of the transmission.
16. Using a snap ring pliers, remove the 5th synchronizer snap
ring from the end of the counter shaft.
17. Remove the 5th synchronizer assembly with its fork and
rail assembly from the counter shaft.
MANUAL TRANSMISSION 5B-19

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents