SSANGYONG 1999 Musso Service Manual page 450

Table of Contents

Advertisement

1B3-148 OM600 ENGINE MECHANICAL
Tools Required
000 589 58 43 00 Chain Assembling Device
Replacement Procedure
1. Cover over the chain box with cleaning rag and grind off
both chain pins (arrow) at a chain link (1) of the timing chain.
2. Remove the outer plate (4) and chain link (1).
Notice
Ensure that the ends of the timing chain do not drop into
the chain box.
3. Loosen the chain tension with approx. 4 turns.
4. Connect the new timing chain (arrow) with chain link (1) to
the old timing chain (2).
5. By rotating the crankshaft in the of engine rotation, pull out
the old timing chain with installing the new timing chain.
6. Remove the old timing chain and hold the ends of the new
timing chain to camshaft sprocket (3) with wire (arrow).

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents