SSANGYONG 1999 Musso Service Manual page 549

Table of Contents

Advertisement

Circuit Diagram
Inspection & Maintenance Procedure (for MSE)
1. While the ignition switch is in 'OFF' position, remove the
wiring connectors (1 and 15) from ignition coil and measure
the primary resistance between terminal No.1 and No.15.
Specified Value
Notice
If out of specified value, replace the ignition coil.
2. During engine cranking, measure primary voltage (T1/1)
between ECU terminal No. 71 and No. 69.
Specified Value
Notice
Measure remaining cables.
- T1/2 : No. 72 and 69.
- T1/3 : No. 70 and 69.
If out of specified value, check ignition cable and ECU.
3. Using a multi-tester, measure the secondary coil resistance
between 5a and 5b.
Specified Value
0.9 - 1.6 W (20°C)
200 - 350 V
6 - 8.5 kW
M162 ENGINE ELECTRICAL 1E1-11

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents