Counter Shaft - SSANGYONG 1999 Musso Service Manual

Table of Contents

Advertisement

5B-34 MANUAL TRANSMISSION

COUNTER SHAFT

Disassembly Procedure
1. Using a hydraulic press and special tool, remove the front
bearing assembly from the counter shaft.
2. Check and clean all removed parts and replace if necessary.
Assembly Procedure
1. Using a hydraulic press and installer, press the front bearing
assembly onto the counter shaft.
2. Install is as follows :
Install a new O-ring on the counter shaft outer race and
lubricate it.
Using a installer, lightly tap the race into its bore until the
O-ring is compressed.
Install the race to be fully seated on the inside of the
case.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents