1-220 XPM card replacement procedures (continued)
NT7X05
in an RSC-S (PCM-30) Model A RCO2
7
At the frame
8
At the MAP display
9
297-8021-547 Standard 14.02 May 2001
The system runs a pre-SWACT audit to determine the ability of the inactive
unit to accept activity reliably.
Note: A maintenance flag appears when maintenance tasks are in
progress. Wait until the flag disappears before proceeding with the next
maintenance action.
If the message is
SWACT passed
SWACT failed
SWACT failed Reason: XPM
SWACTback
SWACT refused by SWACT
controller
Return to the Alarm Clearing Procedure , to clear the alarm condition on the
inactive unit. When the alarm is cleared, return to step 1 of this procedure.
Put a sign on the active unit bearing the words Active unit—Do not touch.
Busy the inactive RCO2 unit by typing
>BSY INACTIVE
and pressing the Enter key.
(continued)
Do
step 8
step 7
step 7
step 7