Nortel DMS-100 Series Replacement Procedures page 167

Hide thumbs Also See for DMS-100 Series:
Table of Contents

Advertisement

and pressing the Enter key.
The system determines the type of SWACT it can perform and displays a
confirmation prompt for the selected SWACT.
If SWACT
can continue at this time
cannot continue at this time
6
Switch the activity of the unit by typing
>YES
and pressing the Enter key.
The system runs a pre-SWACT audit to determine the ability of the inactive
unit to accept activity reliably.
Note: A maintenance flag appears when maintenance tasks are in
progress. Wait until the flag disappears before proceeding with the next
maintenance action.
If the message is
SwAct passed
SwAct failed
SwAct
XPM SwActback
SwAct refused by SwAct
controller
7
Return to the Alarm Clearing Procedures. Clear the alarm condition on the
inactive unit. When the alarm is cleared, return to step 1 of this procedure.
At the frame
Put a sign on the active unit bearing the words: Active unit—Do not touch.
8
This sign should not be attached with magnets or tape.
At the MAP terminal
9
Busy the inactive PM unit by typing
>bsy
unit unit_no
and pressing the Enter key.
where
unit_no
is the number of the faulty SMS unit
DMS-100 Family NA100 Card Replacement Procedures Volume 6 of 7 LET0015 and up
XPM card replacement procedures (continued)
failedReason:
in an SMS
Do
step 6
step 23
Do
step 8
step 7
step 7
step 7
1-135
NT6X92
(continued)