Nortel DMS-100 Series Replacement Procedures page 967

Hide thumbs Also See for DMS-100 Series:
Table of Contents

Advertisement

The system determines the type of SWACT it can perform and displays a
confirmation prompt for the selected SWACT.
If SWACT
can continue at this time
cannot continue at this time
6
Confirm the system prompt by typing
>YES
and pressing the Enter key.
The system runs a pre-SWACT audit to determine the ability of the inactive
unit to accept activity reliably.
Note: A maintenance flag appears when maintenance tasks are in
progress. Wait until the flag disappears before proceeding with the next
maintenance action.
If the message is
SWACT passed
SWACT failed
son:
SWACT refused by SWACT
Controller
7
The inactive unit could not establish two-way communication with the central
control and has switched activity back to the originally active unit. You must
clear all faults on the inactive unit before attempting to clear the alarm
condition on the active unit.
Go to step 9.
8
The SWACT controller does not recommend a SWACT for one of the
following reasons:
IMC link failures
message link failures
parity audit failures
superframe sync failures
inactive unit was unable to keep activity last time
dropping activity
pre-SWACT query failure
unit is jammed inactive
unit is in overload
pre-SWACT difficulties
DMS-100 Family NA100 Card Replacement Procedures Volume 6 of 7 LET0015 and up
XPM card replacement procedures (continued)
Rea-
XPM SWACTback
in an SMS
Do
step 6
step 35
Do
step 12
step 7
step 8
1-935
NTMX71
(continued)

Advertisement

Table of Contents
loading

Table of Contents