ZyXEL Communications MSC1000G User Manual page 517

Management switch card
Hide thumbs Also See for MSC1000G:
Table of Contents

Advertisement

Figure 351 Switch Setup Dot3ad
The following table describes the labels in this screen.
Table 271 Switch Setup Dot3ad
LABEL
LACP Priority
LACP Timeout
Group ID
Active
Dynamic (LACP)
Port
Group
Apply
Cancel
Management Switch Card User's Guide
DESCRIPTION
Type a number between 1 and 65,535 for the LACP system priority. The switch with the
lowest system priority (and lowest port number if system priority is the same) becomes
the LACP "server". The LACP "server" controls the operation of LACP setup. Enter a number
to set the priority of an active port using Link Aggregate Control Protocol (LACP). The
smaller the number, the higher the priority level.
LACP timeout is the time interval between the individual port exchanges of LACP packets in
order to check that the peer port in the trunk group is still up. If a port does not respond
after three tries, then it is deemed to be "down" and is removed from the trunk. Set a
short timeout (one second) for busy trunked links to ensure that disabled ports are
removed from the trunk group as soon as possible. Select either short (1 second) or long
(30 seconds).
This column displays the names of the trunk groups for the management switch card's
Ethernet ports. In the MSC1000G, tsub is for the subtending ports and tup is for the
uplink ports.
Select this check box to turn on a trunk group.
Select this check box to use Link Aggregate Control Protocol (LACP), to dynamically create
and manage the trunk group.
This column lists the management switch card's Gigabit Ethernet interfaces.
This column displays to which trunk group an MSC Gigabit Ethernet interface belongs.
Click Apply to save the changes in this screen to the system's volatile memory. The
system loses these changes if it is turned off or loses power, so use the Config Save link
on the navigation panel and then the Save button to save your changes to the non-volatile
memory when you are done configuring.
Click Cancel to begin configuring this screen afresh.
Chapter 13 Switch Screens
517

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Msc1024gMsc1224gMsc1024gbMsc1024gcMsc1224gb

Table of Contents