5
SETTINGS AND PROCEDURES BEFORE OPERATION
(5) When configuring a CC-Link IE controller network
1)
Development environment (PC)
Figure 5.15 CC-Link IE controller network configuration
Procedures for operation
Start up the C Controller module.
Set parameters, referring to (2) for a single CPU system,
or the flowchart in Section 17.1 for a multiple CPU system.
Start up CC IE Control utility to set Connection settings,
and connect the development environment (personal
computer) to the C Controller module.
On the Module information screen, verify the list of CC-
Link IE controller network modules controlled by the C
Controller module.
In the Parameter settings of the CC IE Control utility, set
the CC-Link IE controller network module parameters.
No
Is the access target system a
multiple CPU system?
Yes
Set the logical station No. on the <<Target settings>> tab
of the CC IE Control utility.
Is the system a single CPU system?
Yes
Write the set parameters from the <<Online operation>>
tab of the CC IE Control utility to the C Controller module.
Reset the C Controller module with the RESET/SELECT
switch. (Resetting the module makes the written
parameters effective.)
(To 2) on next page)
* 1 To write parameters, connect the utility to the C Controller module with Write authority enabled.
(
Section 5.11, Section 9.1.3)
Figure 5.16 Flowchart for CC-Link IE controller network configuration
5.3 Settings and Procedures before Operation
C Controller module
CC-Link IE controller network
Ethernet
This section (1)
This section (2) or
This section (2) or
Section 17.1
Section 16.1
Section 9.1.3
Section 9.4.2 (1)
Section 9.4.5
Section 9.4.6
No
(To 3) on next page)
Section 9.4.4 (1)
*1
Section 5.4 (3)
1
2
3
4
5
6
7
8
5
- 17

Advertisement

Table of Contents
loading

This manual is also suitable for:

Melsec q06ccpu-vMelsec q06ccpu-v-bMelsec sw3pvc-ccpu-e

Table of Contents