Mitsubishi Electric Melsec Q Series Programming Manual page 542

Motion controller (sv13/sv22)
Hide thumbs Also See for Melsec Q Series:
Table of Contents

Advertisement

APPENDICES
(2) Vision Program Operation Setting
The job (vision program) set in the vision system is assigned as a program
number so that it can be executed from the vision system dedicated functions.
(a) Program No. (Not necessary to set)
This number (1 to 32) is used by the vision system dedicated function to
identify the vision system job.
(b) Vision System (camera) No.
Set the vision system number corresponding to the vision system that is
executing the job.
(c) Vision Program Name
Set the name of the job executed by the vision system dedicated function.
(d) Status Storage Device
Set the word device that stores the job's load status and the vision system's
online/offline status.
Settable word devices are shown below.
Item
Data register
Link register
Motion register
(Note-1): Only the user device range can be set.
Both of them are set to 0 at the Multiple CPU system's power supply ON.
The job's load status is indicated with the following values.
Storage value
0
1
Device No. setting range
D0 to D8191
Job not loaded or offline
Job loading completed and
online
APP - 51
(Note-1)
W0 to W1FFF
#0 to #7999
Status
The job is not loaded, or even if loaded is
offline.
(An error occurs if a trigger is issued.)
The job has been loaded and is online.
(The job is executed if a trigger is issued.)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents