Mitsubishi Electric Melsec Q Series Programming Manual page 532

Motion controller (sv13/sv22)
Hide thumbs Also See for Melsec Q Series:
Table of Contents

Advertisement

APPENDICES
Programming operation
P0
[G151]
//Did you turn on PX4, and turn
//off a stop?
PX4*!M100
P10
[K150:Real]
1 ABS-2
Axis
1,
Axis
2,
Vector speed
500000 pulse/s
[G200]
//Did 1 axis and 2 axes execute
//positioning completion?
M2401*M2421
[G154]
//Did you turn on 1 axis and 2 axes
//in-position signal?
M2402*M2422
[F150]
#0L=1000000//1 axis positioning
//address set
#2L=2000000//2 axes positioning
//address set
#4L=500000//Positioning speed set
P20
[K151:Real]
1 ABS-2
Axis
1,
#
0 pulse
Axis
2,
#
2 pulse
Vector Speed
#
4 pulse/s
[G200]
//Did 1 axis and 2 axes execute
//positioning completion?
M2401*M2421
[G156]
//Did you turn on PX4, and turn
//off a stop?
!PX4*!M100
P0
(c) No.150 : Programming operation
WAIT transition which
wants to stop substitutes
"The internal relay (M100)
for the stop turns off." for
the AND status.
The motion control step
executed absolute
0 pulse
positioning to application
0 pulse
with it when to start again
after it stops on the way.
The motion control step
executed absolute
positioning to application
with it when to start again
after it stops on the way.
This program substitutes
"The internal relay (M100)
for the stop turns off." into
the AND status in WAIT
transition which wants it to
stop.
[G202]
!M100 //Did you turn off a stop?
[G202]
!M100 //Did you turn off a stop?
APP - 41
This program is judged
whether it was stopped by
using the location complete
signal during the location
on the way.
This program is made to
execute the motion control
step of again after internal
relay (M100) of the stop
waits to turn it off when
positioning completion is
not turned on after the
motion control is executed.
P10
This program is judged
whether it was stopped by
using the location complete
signal during the location
on the way.
It is made to execute the
motion control step of again
after internal relay (M100)
of the stop waits to turn it
off when positioning
completion is not turned on
after the motion control is
executed.
P20

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents