Basic operation instruction

7.1 What this chapter contains

This chapter describes the internal function modules of the inverter in details.
 Check all terminals are connected properly and tightly.
 Check that the power of the motor corresponds to that of the inverter.

7.2 First powering on

Check before powering on
Please check according to the installation list in Chapter 2.
Original powering operation
Check to ensure there is no mistake in wiring and power supply, switch on the air switch of the AC
power supply on the input side of the inverter to power on the inverter. 8.8.8.8.8. will be displayed on
the keypad, and the contactor closes normally. When the character on the nixie tubs changes to the
set frequency, the inverter has finished the initialization and it is in the stand-by state.
Below diagram shows the first operation: (take motor 1 as the example)
-117-
Basic operation instruction
7

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Goodrive300-19 Series and is the answer not in the manual?

Questions and answers

Table of Contents