Powering On - HPE StoreOnce 6500 User Manual

Table of Contents

Advertisement

Model

Powering on

To power on the appliance, you must use the StoreOnce CLI and/or power on buttons. You can shut down
or reboot the appliance using either the StoreOnce CLI or the StoreOnce Management GUI on the
Maintenance page. See Maintenance on page 187 for more information about using the StoreOnce GUI
for power off options.
IMPORTANT: It is best to failover a service set during the node power on or reboot sequence in
case of unexpected errors with the node.
NOTE: If network switches and storage enclosures have been powered off, power on those first (using
the power on switches).
After maintenance activities, both servers must be powered on at the same time so that the checks in the
code can complete before the file system starts.
Procedure
1. Power on the servers using either:
Base Storage Capacity
Storage Expansion
Options
disks, which are added
to the original disk
enclosures in the
sequence described in
this guide. A maximum
of five of these kits can
be used with each
couplet until all disk
bays are full in both disk
enclosures.
By adding couplets to
the cluster (StoreOnce
6600 120TB 2nd/4th
Couplet and/or
StoreOnce 6600 120TB
3rd Couplet):
Once all bays in both
enclosures connected to
a couplet are full, it may
be possible to add a
couplet to your HPE
StoreOnce 6600
System. The maximum
cluster configuration
accommodates four
couplets.
Optional Hardware
– 8 Gb Fibre Channel cards
– 16 Gb Fibre Channel
cards
Powering on
17

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Storeonce 6600

Table of Contents