3 SPECIFICATIONS AND FUNCTIONS
Important
1 : The BUSY signal turns ON even when position control of movement amount 0 is
executed. However, since the ON time is short, the ON status may not to be detected in the
PLC program.
2 : "Positioning complete" of the QD75 refers to the point when the pulse output from QD75 is
completed.
Thus, even if the QD75's positioning complete signal turns ON, the system may continue
operation.
3 - 16
MELSEC-Q