10 HIGH-LEVEL POSITIONING CONTROL

10.1 Outline of high-level positioning control

In "high-level positioning control" the execution order and execution conditions of the
"positioning data" are set to carry out more applied positioning. (The execution order
and execution conditions are set in the "block start data" and "condition data".)
The following applied positioning controls can be carried out with "high-level positioning
control".
High-level positioning
control
Block
1 start
With one start, executes the positioning data in a random block with the set order.
(Normal start)
Carries out condition judgment set in the "condition data" for the designated
positioning data, and then executes the "block start data".
• When the condition is established, the " block start data" is executed.
Condition start
• When not established, that " block start data" is ignored, and the next point's " block
start data" is executed.
Carries out condition judgment set in the "condition data" for the designated
positioning data, and then executes the " block start data".
Wait start
• When the condition is established, the " block start data" is executed.
• When not established, stops the control until the condition is established. (Waits.)
Simultaneous start
Simultaneously executes the positioning data having the No. for the axis designated
with the "condition data". (Outputs pulses at the same timing.)
2
Repeated start (FOR
Repeats the program from the " block start data" set with the "FOR loop" to the "
loop)
block start data" set in "NEXT" for the designated No. of times.
Repeats the program from the " block start data" set with the "FOR condition" to the "
Repeated start (FOR
block start data" set in "NEXT" until the conditions set in the "condition data" are
condition)
established.
High-level positioning control sub functions
"High-level positioning control" uses the "positioning data" set with the "major
positioning control". Refer to Section 3.2.4 "Combination of QD75 main functions
and sub functions" for details on sub functions that can be combined with the
major positioning control.
Note that the sub function Section 12.7.8 "Pre-reading start function" cannot be
used together with "high-level positioning control".
High-level positioning control from peripheral devices
"High-level positioning control" (start of the "block start data") can be executed
from GX Configurator-QP test mode.
Refer to GX Configurator-QP Operating Manual for details on starting of the "block
start data" from GX Configurator-QP.
REMARK
Block
1:
"1 block" is defined as all the data continuing from the positioning data in which
"continuous positioning control" or "continuous path control" is set in the
operation pattern (
positioning control (Positioning complete)" is set.
Simultaneous start
Besides the simultaneous start of "block start data" system, the "simultaneous
starts" include the "multiple axes simultaneous start control" of control system.
Refer to Section 10.5 "Multiple axis simultaneous start control" for details.
Da.1
) to the positioning data in which "independent
2:
10 - 2