Mitsubishi Electric MELSEC-Q QD75M User Manual page 549

Positioning module
Table of Contents

Advertisement

12 CONTROL SUB FUNCTIONS
Setting item
OP shift amount
Pr.53
Speed
designation
Pr.56
during OP shift
Refer to Section 5.2 "List of parameters" for setting details.
(2) OP shift operation at the "
(When "
Pr.56
Pr. 44 OPR
direction
Zero point
Machine OPR start
Near-point dog
Zero signal
Fig. 12.7 OP shift operation at the creep speed
[4] Precautions during control
The following data are set after the OP shift amount is complete.
OPR complete flag (
Md.20
Current feed value
Md.21
Machine feed value
Md.26
Axis operation status
Md.34
Movement amount after near-point dog ON ("
amount" is not added.)
OPR request flag (
shift.
[5] Setting the OP shift function
To use the "OP shift function", set the required details in the parameters shown in
the following table, and write them to the QD75.
When the parameters are set, the OP shift function will be added to the machine
OPR control. The set details are validated at the rising edge (OFF
PLC READY signal (Y0).
Setting
value
Set the shift amount during the OP shift.
Select the speed during the OP shift
REMARK
Parameters are set for each axis.
It is recommended that the parameters be set whenever possible with GX
Configurator-QP. Execution by PLC program uses many PLC programs and
devices. The execution becomes complicated, and the scan times will increase.
Pr.47
Creep speed"
Speed designation during OP shift" is 1)
Pr. 47 Creep
speed
When the " Pr. 53 OP
shift amount" is negative
Md.31
Status: b4)
Md.31
Status: b3) is reset after completion of the OP
Setting details
0:
Pr.46
OPR speed
1:
Pr.47
Creep speed
12 - 10
MELSEC-Q
When the " Pr. 53 OP
shift amount" is positive
OP
Pr.53
OP shift
ON) of the
Factory-set
initial value
0
0

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents