Sensor Module Repair & Cleaning; Figure 11-6: Sensor Module Wiring And Pneumatic Fittings - Teledyne t100 Operation Manual

Uv fluorescence so2 analyzer
Hide thumbs Also See for t100:
Table of Contents

Advertisement

Teledyne API - T100 UV Fluorescence SO
11.7.2.
SENSOR MODULE REPAIR & CLEANING
Figure 11-6:
I
MPORTANT
06807F DCN7335
Analyzer
2
CAUTION - GENERAL SAFETY HAZARD
Do not look at the UV lamp while the unit is operating. UV light can cause
eye damage. Always use safety glasses made from UV blocking material
when working with the UV Lamp Assembly. (Generic plastic glasses are
not adequate).
Sensor Module Wiring and Pneumatic Fittings
After any repair or service has been performed on the sensor module, the
T100 should be allowed to warm up for 60 minutes.
Always perform a leak check (refer to Section 10.3.6) and calibrate the
analyzer (refer to Section 9) before placing it back in service.
I
R
MPACT ON
EADINGS OR
Troubleshooting & Service
D
ATA
245

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

T108uT100hT108T100u

Table of Contents