Getting Started; Unpacking The T100 Analyzer - Teledyne t100 Operation Manual

Uv fluorescence so2 analyzer
Hide thumbs Also See for t100:
Table of Contents

Advertisement

3.

GETTING STARTED

3.1.

UNPACKING THE T100 ANALYZER

ATTENTION
Note
06807F DCN7335
This section addresses the procedures for unpacking the instrument and inspecting for
damage, presents clearance specifications for proper ventilation, introduces the
instrument layout, then presents the procedures for getting started: making electrical and
pneumatic connections, and conducting an initial calibration check.
Avoid personal injury: always use two persons to lift and carry the T100.
COULD DAMAGE INSTRUMENT AND VOID WARRANTY
Printed Circuit Assemblies (PCAs) are sensitive to electro-static
discharges (ESD) too small to be felt by the human nervous system.
Failure to use ESD protection when working with electronic assemblies
will void the instrument warranty. Refer to the manual on Fundamentals
of ESD, PN 04786, which can be downloaded from our website at
http://www.teledyne-api.com
the Special Manuals section.
Do not operate this instrument until you've removed dust plugs from
SAMPLE and EXHAUST ports on the rear panel!
Teledyne API recommends that you store shipping containers/materials
for future use if/when the instrument should be returned to the factory for
repair and/or calibration service. See Warranty section in this manual and
shipping procedures on our Website at
under Customer Support > Return Authorization.
CAUTION
GENERAL SAFETY HAZARD
under Help Center > Product Manuals in
CAUTION
http://www.teledyne-api.com
27

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

T108uT100hT108T100u

Table of Contents