12 CONTROL SUB FUNCTIONS

12.2.2 OP shift function

Pr. 46 OPR speed
Machine OPR start
When a machine OPR is carried out, the OP is normally established using the near-
point dog, stopper, and zero signal. However, by using the OP shift function, the
machine can be moved a designated movement amount from the position where the
zero signal was detected. A mechanically established OP can then be interpreted at
that point.
The details shown below explain about the "OP shift function".
[1] Control details
[2] Setting range for the OP shift amount
[3] Movement speed during OP shift
[4] Precautions during control
[5] Setting the OP shift function
[1] Control details
The following drawing shows the operation of the OP shift function.
Pr. 44 OPR direction
Near-point dog
Zero signal
Fig. 12.4 OP shift operation
12 - 8
MELSEC-Q
Speed selected by the" Pr. 56
Speed designation during
OP shift"
Pr.47 Creep speed
Pr.53 OP shift amount

Hide quick links: