Mitsubishi Electric QD75MH1 User Manual page 473

Type qd75mh positioning module
Table of Contents

Advertisement

9 MAJOR POSITIONING CONTROL
Positioning start
signal
[Y10,Y11,Y12,Y13]
BUSY signal
[XC,XD,XE,XF]
M code ON signal
[X4,X5,X6,X7](WITH mode)
Cd.7 M code OFF request
Start complete signal
[X10,X11,X12,X13]
Md.26 Axis operation status
Positioning operation
External speed-position
switching command
Positioning complete signal
[X14,X15,X16,X17]
M code ON signal (AFTER mode)
[X4,X5,X6,X7]
Cd.7 M code OFF request
OPR complete flag
Md.31 Status: b4
Fig. 9.17 Operation timing and processing time during speed-position switching control (ABS mode)
Normal timing time
t1
1.1
The t1 timing time could be delayed by the operation state of other axes.
Operation timing and processing time during speed-position switching
control (ABS mode)
t1
t2
Standing
In speed control
by
t4
t2
t3
0 to 2.0
0 to 1.6
2.8 to 5.1
t3
Standing by
In position control
Speed
Position
control
control
Speed control carried out until speed-position switching
signal turns ON
t6
t5
t2
t4
t5
0 to 1.1
9 - 94
MELSEC-Q
t7
Unit: ms
t6
t7
0.2
Follows parameters

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Qd75mh2Qd75mh4

Table of Contents