Creating Multiples and Serialization in Vision 9 Expert and Pro
323
Click on the column header (where the variable text is displayed). All rows will now be highlighted in blue
and the Serialization box will be activated.
Click on the Serialization box.
The Serialize window will appear.
© 2015 Vision Engraving and Routing Systems