Vision VR48 4 Series User Manual page 16

Table of Contents

Advertisement

16
Vision VR48 Series 4 Router User Manual
Leveling the machine
1. Make sure the machine has been properly located at your work-site.
2. It is not necessary to bolt your machine to the floor in your facility. However, a solid, stable
foundation is required to support the machine's weight.
3. There should be a leveling bolt in each of the four machine legs.
4. Place a precision leveling gauge on the machine's table top and adjust the leveling bolts until the
machine is level in both the horizontal and vertical directions.
Scheduling the Installation
1. Please schedule an electrician for the morning of the first day of installation/machine orientation to
connect the router table, vacuum pump motor, and dust collector to the junction boxes and outlets.
2. If an electrician is not available for the installation, please call Vision ASAP in order to reschedule
installation/machine orientation. If Vision personnel arrive and the electrical connections are not
ready and the electrician is not present, there will be an additional charge $750/day while waiting.
The first time the Vacuum Pump is turned on, check that the direction of rotation is correct. Turn it on,
then off, observing the direction of rotation. It should match the arrow on the pump near the motor. If
necessary, swap any two of the three power leads to change the rotation to the opposite direction.
Prolonged usage of the vacuum pump when rotating in the incorrect direction can cause permanent
damage to the pump.
WARNING:
© 2015 Vision Engraving and Routing Systems

Advertisement

Table of Contents
loading

Table of Contents