Vision VR48 4 Series User Manual page 15

Table of Contents

Advertisement

Locating the Router
1. A doorway of at least 80 inches wide and 80 inches high is required in order for the router to be
moved into your facility.
2. Locate machine indoors on a flat surface and on a solid foundation.
3. Temperature must remain between 40°F and 85°F.
4. Do not expose machine to direct sunlight, rain, vibration, dampness, or explosive environments.
5. A forklift is required to remove the crate from the shipping truck and to locate the equipment in the
building. The forklift must have a minimum capacity of 6,000 lbs and 6' or longer forks.
6. A pallet jack is required to level the router table.
7. The router table footprint is approximately 6.7 feet x 10.7 feet. A designated work area of at least 5
feet is strongly recommended around all sides of the machine to ensure ease of operation, material
handling, cleaning, maintenance and safety.
8. Typically, the vacuum pump is between the router table and Wall A (Refer to Installation Layout
Diagram - Section 2.1). Please note the orientation of the pump and motor.
© 2015 Vision Engraving and Routing Systems
General Information - Installation
15

Advertisement

Table of Contents
loading

Table of Contents