INTAKE AND EXHAUST - <Turbo>
Preremoval and Post-installation Operation
Air Conditioning Low-Pressure Hose and Liquid Pipe
l
B Clamp Removal and installation
(Refer to GROUP 55 - Refrigerant Line.)
Brake Booster VacuumTube Clamp Removal and Instal-
l
lation (Referto GROUP 35 -Master Cylinder and Brake
Booster.)
Removal steps
1. Main muffler and center exhaust
installation bolts
2. Rubber hangers
3. Rubber hangers
4. Main muffler
7. Hanger brackets
5.
Gasket
6.
Mouldings
Exhaust Pipe, Main Muffler and Catalytic Converter
Clutch Booster Vacuum Pipe Removal and Installation
l
(Refer to GROUP 21 - Clutch Control.)
Drive Shaft (Left Side), Inner Shaft Assembly Removal
l
and Installation (Refer to GROUP 26 - Drive Shaft.)
l rl .I-
13 Nm
9 ft.lbs.
pipe
TSB Revision
13 Nm
9 ft.lbs.
,
4
13 Nm
2
9 ft.lbs.
9 ft.lbs.
8. Catalytic converter and center exhaust
pipe installation nuts
9. Hanger bracket
10. Rubber hangers
exhaust pipe
Center
11.
13. 12.
Gasket Rubber
hangers
14. Hanger brackets
3
5 Nm
4 ft.lbs,