INTAKE AND EXHAUST
Pre-removal and Post-installation Operation
Catalytic Converter Removal and Installation
l
33 ft.lbs.
Exhaust manifold removal steps
(front)
1. Drive belt (Generator)
(Refer to GROUP
Adjustment Procedures.)
2. Generator assembly
3. Oil level gauge guide
Heat protector
4.
5. Exhaust manifold (front)
6. Gasket
Condenser Fan Motor Assembly Removal and Installa-
l
tion <Vehicles with Air Conditioning>
(Refer to GROUP 14 - Radiator.)
11 - Service
INSPECTION
Check the following points;
found.
Check for damage of cracking of any part.
l
TSB
Revision
43 ft.lbs.
60 Nm
43 ft.lbs.
0 0 0 0 0 6 1 7
7
Exhaust manifold removal steps
(rear)
7. Stud
8. Heat protector
9. EGR pipe
10. Exhaust manifold (rear)
11. Gasket
replace the part if a problem is
15-27
60 Nm
12-15 Nm