Mitsubishi 3000GT Service Manual page 426

Chassis and body
Hide thumbs Also See for 3000GT:
Table of Contents

Advertisement

15-8
INTAKE AND EXHAUST - On-vehicle Service
I
TURBOCHARGER WASTE GATE SOLENOID
CHECK (Turbo)
OPERATION CHECK
(1) Connect a hand vacuum pump to the solenoid valve nipple
(A) (see the illustration to the left).
(2) Using a jumper wire, connect between the solenoid valve
terminal and battery terminal.
(3) Connecting and disconnecting the jumper wire at the bat-
tery negative terminal to apply a negative pressure, check
tightness.
Jumper wire
Connected
Disconnected
COIL RESISTANCE CHECK
Measure resistance between solenoid valve terminals.
Standard value: 36-44 Q [at 20°C (SS'F)]
TURBOCHARGER BYPASS VALVE CHECK
(Turbo)
(1) Remove the turbocharger bypass valve.
(2) Connect the hand vacuum pump to the nipple of the
turbocharger bypass valve.
(3) Apply a negative pressure of approx. 400 mmHg (16
air tightness is maintained.
Negative pressure
About 400 mmHg (16 in.Hg)
TSB Revision
(B) nipple
Normal condition
condition
Open
Negative pressure leaks.
Close
Negative pressure is held.
Open
Negative pressure is held.
Valve operation
It starts opening
I

Advertisement

Table of Contents
loading

This manual is also suitable for:

1992 3000gt1993 3000gt1994 3000gt1996 3000gt3000gt 19923000gt 1993 ... Show all

Table of Contents