Node Component Replacement; 7Mm Hot-Swap Drive Replacement - Lenovo ThinkEdge SE360 V2 User Manual

Hide thumbs Also See for ThinkEdge SE360 V2:
Table of Contents

Advertisement

Figure 95. Installing the bezel
After this task is completed
Complete the parts replacement. See
Demo Video
Watch the procedure on YouTube

Node component replacement

Follow instructions in this section to remove and install the node components.

7mm hot-swap drive replacement

Follow instructions in this section to remove and install a 7mm hot-swap drive.
Remove a 7mm hot-swap drive
Follow instructions in this section to remove a 7mm hot-swap drive.
About this task
Attention:
• Read
"Installation Guidelines" on page 47
work safely.
• If the node is installed in an enclosure or mounted, remove the node from the enclosure or mount. See
"Configuration guide" on page
• To make sure that there is adequate system cooling, do not operate the server for more than two minutes
without either a drive or a filler installed in each bay.
• If one or more NVMe solid-state drives are to be removed, it is recommended to disable them beforehand
via the operating system.
• Before you remove or make changes to drives, drive controllers (including controllers that are integrated
on the system board), drive backplanes, or drive cables, make sure to back up all important data stored in
drives.
ThinkEdge SE360 V2 User Guide
100
"Complete the parts replacement" on page
and
"Safety inspection checklist" on page 48
54.
324.
to ensure that you

Advertisement

Table of Contents
loading

This manual is also suitable for:

7dam

Table of Contents