Lenovo ThinkEdge SE360 V2 User Manual page 78

Hide thumbs Also See for ThinkEdge SE360 V2:
Table of Contents

Advertisement

Figure 43. Installing the node filler
Install the front shipping bracket
Attention: When the front shipping bracket is installed, the front operator panel is not accessible. Make sure
to complete the following procedure before installing the front shipping bracket:
1. Connect the power cable and other necessary external cables to the node.
2. Power on the server and any peripheral devices. See
Procedure
Step 1.
Push the shipping bracket toward the enclosure until it is firmly seated.
Figure 44. Installing the shipping bracket
Step 2.
Secure the captive screws of the shipping bracket.
a.
Fasten the captive screw on the top.
b.
Fasten the four captive screws on both sides.
c.
Fasten the three captive screws on the front.
ThinkEdge SE360 V2 User Guide
68
"Power on the server" on page
53.

Advertisement

Table of Contents
loading

This manual is also suitable for:

7dam

Table of Contents