Nortel CC MIS User Manual page 26

Call center management information system
Hide thumbs Also See for CC MIS:
Table of Contents

Advertisement

CC MIS requirements
Table 3:
Hardware requirements for CC MIS server (Part 4 of 4)
Hardware
Modem
Backup/Restore
UPS purpose and requirements
You can use a UPS with the CC MIS Linux server. A UPS provides the
following benefits:
Reduction in data loss—A UPS shuts down the server gracefully if an
interruption in AC power occurs. A graceful shutdown prevents data
corruption and reduces the risk of data loss.
Reduction in power dips and spikes—The UPS regulates AC power
supplied to the server.
Note: Any data backups that are running at the time of a shutdown are
unusable.
26
Supported minimum
1 external modem
(requires a serial port)
Optional:
A separate system on
the network that
supports the Network
File System (NFS) or
Samba shared file
systems can be used to
store CC MIS backup
data.
Call Center Management Information System
Notes
A modem is not required if
an alternative method for
remote support is provided.
(For example, Telnet from
another system in the
network.)
Another option is to use a
separate physical disk as the
location for backups.
Standard 2.0

Advertisement

Table of Contents
loading

Table of Contents