Nortel DMS-100 Manual page 532

Hide thumbs Also See for DMS-100:
Table of Contents

Advertisement

Emergency shutdown of one unit of MSB7s
4
To switch the activity of the units, type
>SWACT
and press the Enter key.
Example of a MAP display:
MSB7 0
Please confirm ("YES", "Y", "NO" or "N"):
If the MAP response
indicates a warm SwAct
indicates other than listed here
5
To cancel the switch of activity, type
>NO
and press the Enter key.
6
Activity on the PM cannot switch at this time. Proceed as follows:
If you
want to power down the inactive
unit
want to leave both units of this
MSB7 in service and work on
the next MSB7
7
To confirm the prompt to switch the activity of the units, type
>YES
and press the Enter key.
8
To manually busy the inactive unit of the MSB7, type
>BSY
UNIT
and press the Enter key.
where
unit_no
is the PM unit number (0 or 1)
9
To identify the network type and network links that associate with the manual
busy MSB7 unit, type
>TRNSL C
and press the Enter key.
Example of a MAP response for JNET:
DMS-100 Family NA100 Recovery Procedures LET0015 and up
Emergency power conservation recovery procedures
Emergency power conservation
A Warm SwAct will immediately be performed
unit_no
Do
step 7
step 5
Do
step 8
step 2
5-181
(continued)

Advertisement

Table of Contents
loading

Table of Contents