Restoring the LPP LIM to duplex operation
Restoring the LPP LIM to duplex operation
At the LPP
1
Power up the LIM unit you powered down to conserve emergency power as
follows:
If you powered down unit 0, lift and release the power switch on the
faceplate of the NT9X30 power converter. The power switch on the
faceplate of the NT9X30 power converter is in slot 4F.
If you powered down unit 1, lift and release the power switch on the
faceplate of the NT9X30 power converter. The power switch on the
faceplate of the NT9X30 power converter is in slot 36F.
At the MAP terminal
2
To access the peripheral module (PM) level of the MAP display, type
>MAPCI;MTC;PM
and press the Enter key.
Example of a MAP display:
SysB
PM
3
To post the LIM that you restore to duplex operation, type
>POST
LIM
and press the Enter key.
where
DMS-100 Family NA100 Recovery Procedures LET0015 and up
Emergency power conservation recovery procedures
Emergency power conservation
WARNING
Potential extended equipment outage
Nortel recommends that you contact the Emergency
Technical Assistance Service (ETAS) to expedite the
recovery of equipment.
WARNING
Potential loss of service or extended outage
Use this procedure to restore normal operation after you
perform the procedure for emergency power conservation.
Do not use this procedure or sections of this procedure for
equipment maintenance purposes.
ManB
OffL
1
10
lim_no
CBsy
ISTb
InSv
12
0
5-47
(continued)
6
49