Restoring A Supernode Se Enet To Duplex Operation - Nortel DMS-100 Manual

Hide thumbs Also See for DMS-100:
Table of Contents

Advertisement

Application
Use this procedure to restore a SuperNode SE enhanced network (ENET) to
duplex operation. This procedure applies to SuperNode SE 16k and 32k
ENET. Perform this procedure after you power down one ENET plane to
conserve emergency power.
This procedure assumes that you followed the procedure Emergency power
conservation—Shutdown to take equipment out of service. This procedure
also assumes that all equipment was in normal in-service operation before the
need to perform the emergency power conservation procedure occurred.
Action
The following flowchart is a summary of the procedure. Use the instructions
in the step-action procedure that follow the flowchart to perform the recovery
task.
Emergency power conservation recovery procedures 5-77

Restoring a SuperNode SE ENET to duplex operation

DMS-100 Family NA100 Recovery Procedures LET0015 and up
Emergency power conservation