5-20 Emergency power conservation recovery procedures
Emergency power conservation
Restoring the ELPP LIM to duplex operation
Restoring the ELPP LIM to duplex operation
At the ELPP
1
At the MAP terminal
2
3
297-8021-545 Standard 14.02 May 2001
WARNING
Potential extended equipment outage
Nortel recommends that you contact the Emergency
Technical Assistance Service (ETAS) to expedite the
recovery of equipment.
WARNING
Potential loss of service or extended outage
Use this procedure to restore normal operation after you
perform the procedure for emergency power conservation.
Do not use this procedure or sections of this procedure for
equipment maintenance purposes.
Power up the LIM unit you powered down to conserve emergency power as
follows:
If you powered down unit 0, lift and release the power switch on the
faceplate of the NT9X31 power converter. The power switch on the
faceplate of the NT9X31 power converter is in slot 1F. Lift and release
the power switch on the faceplate of the NT9X30 power converter. The
power switch on the faceplate of the NT9X30 power converter is in slot 4F.
If you powered down unit 1, lift and release the power switch on the
faceplate of the NT9X31 power converter. The power switch on the
faceplate of the NT9X31 power converter is in slot 33F. Lift and release
the power switch on the faceplate of the NT9X30 power converter. The
power switch on the faceplate of the NT9X30 power converter is in slot
36F.
To access the peripheral module (PM) level of the MAP display, type
>MAPCI;MTC;PM
and press the Enter key.
Example of a MAP display:
SysB
ManB
PM
1
To post the LIM that you wish to restore to duplex operation, type
>POST
LIM
lim_no
(continued)
OffL
CBsy
10
12
0
ISTb
InSv
6
49