Nortel DMS-100 Manual page 186

Hide thumbs Also See for DMS-100:
Table of Contents

Advertisement

Recovering link peripheral processors
If all power converters
did not power up
12
To restart the power for the frame, perform the procedure Clearing an Ext
FSP LPP cabinet major alarm procedure from the Alarm and Performance
Monitoring Procedures .
When the procedure is complete, return to this point.
Go to step 7.
13
Reseat all NT9X74 cards as follows:
a
Slowly slide each card back into the LIS.
b
Push on the upper and lower edges of each faceplate to reseat the card
completely in the shelf.
c
Close the locking levers on the card.
14
Repeat steps 3 through 13 for each LPP in your office.
When all LPPs have power, continue this procedure at step 15.
At the MAP
15
To access the SRSTATUS level of the MAP display, type
>MAPCI;MTC;SRSTATUS
and press Enter
Example of a MAP display:
SRSTATUS
OVERALL STATUS Pend:
0
Quit
VIEW: SYSTEM
2
View_
3
List_ MS
4
NET
5
SER1
6
SER2
7
SER3
8
9
SRSTATUS:
16
From the MAP display, determine the recovery status of the Series III PMs
Note: The series III PM recovery status appears at the right of the word
SER3 of the MAP display. The recovery status is either pending, in
progress, complete, or failed.
If the number of Series III PMs
that failed recovery is
zero
other than zero
DMS-100 Family NA100 Recovery Procedures LET0015 and up
Node level recovery procedures
18%
Pend InPrg
Comp
Fail
0
0
2
0
0
6
0
1
6
1
1
60
11
8
30
Do
step 12
InProg: 9%
Comp: 70%
Pend
InPrg
0
IOD
5
5
0
Other 21
3
0
1
1
Do
step 86
step 17
3-19
(continued)
Fail: 3%
11:52:34
Comp
Fail
30
2
13
3

Advertisement

Table of Contents
loading

Table of Contents