5-172 Emergency power conservation recovery procedures
Emergency power conservation
Emergency shutdown of one SuperNode SE MS plane
4
5
6
7
8
297-8021-545 Standard 14.02 May 2001
If
both MS planes have faults
Do not continue this procedure until you clear the faults on a minimum of one
or more MS. To clear the the faults on a minimum of one MS, clear the correct
MS alarms. When a minimum of one MS is fault free, go to step 2.
To switch clock mastership, type
>SWMAST
and press the Enter key.
Example of a MAP response:
Request to Switch Clock Mastership MS: 0 submitted.
Request to Switch Clock Mastership MS: 0 passed.
If the SWMAST command
passed
failed
Do not continue this procedure until you clear any faults that can prevent the
switch of mastership. To clear the faults, clear the correct MS alarms. Go to
step 2.
Wait 10 min to make sure the MS has stability. When you verify the MS has
stability, continue the procedure.
To manually busy the slave MS, type
>BSY
ms_number
and press the Enter key.
where
ms_number
is the number of the slave MS (0 or 1)
Example of a MAP response:
Request to MAN BUSY MS: 0 submitted.
Request to MAN BUSY MS: 0 passed.
(continued)
Do
step 4
Do
step 7
step 6