Application
Use this procedure to conserve emergency backup power. To conserve backup
power, shut down one plane of the junctored network (JNET). This procedure
applies to the following JNET types:
•
•
•
Action
The following flowchart is a summary of the procedure. Use the instructions
in the step-action procedure that follows the flowchart to perform the recovery
task.
Emergency power conservation recovery procedures 5-125
Emergency shutdown of one junctored network plane
NT0X48
NT5X13
NT8X10
DMS-100 Family NA100 Recovery Procedures LET0015 and up
Emergency power conservation