Nortel DMS-100 Manual page 150

Hide thumbs Also See for DMS-100:
Table of Contents

Advertisement

Recovering from a dead system in a SuperNode SE switch
At the MAP terminal
92
93
94
95
a
Move the handle of the POWER switch up and set to the ON position.
b
Press the RESET button on the power converter until the CONVERTER
FAIL LED goes off.
c
Release the RESET button.
To access the NET level of the MAP display, type
>NET
and press the Enter key.
Example of a MAP display:
Net
222 22222
33
Plane 01234
56789
234 56789
01
0
0000
1
0000
JNET
To manually busy the network module to return to service, type
>BSY
plane_no
and press the Enter key.
where
plane_no
is the network plane number (0 to 1)
pair_no
is the network plane pair number (0 to 31)
To return the network module to service, type
>RTS
plane_no
and press the Enter key.
where
plane_no
is the network plane number (0 to 1)
pair_no
is the network plane pair number (0 to 31)
Repeat steps 84 through 94 for each JNET shelf.
When all JNET shelves recover, continue the procedure at step 96.
DMS-100 Family NA100 Recovery Procedures LET0015 and up
System level recovery procedures
11111
11111
01234
56789
pair_no
pair_no
2-103
(continued)
22
01

Advertisement

Table of Contents
loading

Table of Contents