Nortel DMS-100 Manual page 365

Hide thumbs Also See for DMS-100:
Table of Contents

Advertisement

5-16 Emergency power conservation recovery procedures
Emergency power conservation
Restoring the CM duplex operation in SuperNode SE
7
8
9
10
11
At the CM reset terminal for the inactive CPU
12
297-8021-545 Standard 14.02 May 2001
Determine if the autoload route changed when you powered down the
inactive CM plane down to conserve emergency backup power.
If the autoload route
changed
did not change
To access the CMMNT level of the MAP display, type
>CM;CMMNT
and press the Enter key.
To reset the primary autoload route to the correct storage device, type
>AUTOLD
SLM
slm_number
and press the Enter key.
where
slm_number
is the number of the SLM (0 or 1) that was the
primary SLM
device_type
is the type of SLM device (DISK or TAPE)
To access the MC level of the MAP display, type
>CM;MC
and press the Enter key.
To return the manual busy message controller (MC) to service, type
>RTS
mc_ number
and press the Enter key.
where
mc_number
is the number of the manual busy MC (0 or 1)
To release the jam on the inactive CPU, type
>\RELEASE
JAM
and press the Enter key.
RTIF response:
JAM RELEASE DONE
(continued)
Do
step 8
step 10
device_type

Advertisement

Table of Contents
loading

Table of Contents