Recovering From A Dead System In A Supernode Se Switch - Nortel DMS-100 Manual

Hide thumbs Also See for DMS-100:
Table of Contents

Advertisement

2-86 System level recovery procedures

Recovering from a dead system in a SuperNode SE switch

Application
Use this procedure to recover a dead system. A DMS SuperNode SE switch is
dead if the whole switch is without power. Loss or interruption of A and B dc
power feeds to the power distribution centers (PDC) causes a dead switch.
Action
The following flowchart provides an overview of the procedure. Use the
instructions in the step-action procedure that follows the flowchart to perform
the recovery task.
297-8021-545 Standard 14.02 May 2001

Advertisement

Table of Contents
loading

Table of Contents