Nortel DMS-100 Manual page 492

Hide thumbs Also See for DMS-100:
Table of Contents

Advertisement

Emergency shutdown of one LIM unit on each ELPP
Note: For ELPPs F-bus 0 and F-bus 1 exist for each LIS level (1, 2, and 3).
If the response
the command passed
you are asked to confirm the
command
5
To confirm the command, type
>YES
and press the Enter key.
6
To access the next LIS level type
>NEXT
and press the Enter key.
7
Determine if the F-bus has been busied on each LIS levels (1, 2, and 3).
If
the F-bus has been busied on
each LIS level (1, 2, and 3)
the F-bus has not been busied on
each LIS level (1, 2, and 3)
8
To quit the F-bus or LIS level of the MAP display, type
>QUIT
and press the Enter key.
9
To manually busy the LIM unit that you will power down, type
>BSY
and press the Enter key.
where
unit_no
Emergency power conservation recovery procedures
Emergency power conservation
WARNING
Possible loss of service
Make sure that the mate LIM unit is in service before you
manually busy the LIM unit that you will power down.
Failure to follow this procedure can isolate nodes on LIS 1, 2,
and 3.
UNIT
unit_no
is the number of the LIM unit (0 or 1)
DMS-100 Family NA100 Recovery Procedures LET0015 and up
Do
step 6
step 5
Do
step 8
step 4
5-141
(continued)

Advertisement

Table of Contents
loading

Table of Contents